Rim and Heads
For covering of window and door openings in walls of cellular concrete, U-blocks heads are used.
Installation of Falsework in Openings
Lay U-blocks on the mortar and level them.
Place insulation inside the U-blocks – to the outside of the wall. When using ready-insulated blocks, leave this step out.
Prepare reinforcement and put it in the channel formed by the blocks.
Pour concrete into head falsework reinforcement.






