Lubartów Stalowa Wola Kolbuszowa Glogów Małopolski

Rim and Heads

For covering of window and door openings in walls of cellular concrete, U-blocks heads are used.

Installation of Falsework in Openings

Lay U-blocks on the mortar and level them.








Place insulation inside the U-blocks – to the outside of the wall. When using ready-insulated blocks, leave this step out.







Prepare reinforcement and put it in the channel formed by the blocks.








Pour concrete into head falsework reinforcement.